DRIVEWAYS · PATIOS · PAVING

Driveways, patios
& paving.From the ground up.

Explore paving ideas, materials and the details that bring your outdoor space together.

Explore the gallery ↗
THE DETAIL MAKES
THE DIFFERENCE.
Grey block paving outside a white house

Driveways · Block paving

01 / 03
BUILT AROUND YOUR SPACEDriveways·Patios·Paths & entrances·Landscaping
WHAT WE DO

A complete view of your outdoor space.

Driveways, patios and connecting paths, with groundwork, drainage and edging considered together.

THE PORTFOLIO

Let the finish speak for itself.

Explore whole spaces and the details up close. Open a project photograph for a larger view or a clean print layout.

MATERIAL & PATTERN

The character of stone. The rhythm of the pattern.

Start with the look you love. Then match the product, finish and laying method to how the space will be used.

01 / BLOCK PAVING

Structure & definition

Explore contrasting borders, subtle colour blends and a pattern that frames the entrance.

DRIVEWAY IDEAS · PATHS
02 / NATURAL STONE

Texture & variation

Look at the individual tones and surface character, alongside the product’s suitability for the setting.

PATIO IDEAS · GARDEN SPACES
03 / OUTDOOR PORCELAIN

Calm & contemporary

Consider larger formats and a restrained palette, with an outdoor product and installation system selected together.

PATIO IDEAS · TERRACES
THE LAYING PATTERN

A small decision.
A different feel.

Herringbone
Stretcher bond
Stack bond
Installation options

The right foundation for your paving.

Explore different approaches to the ground beneath the finish. The right specification starts with the site and how the space will be used.

Photograph showing a prepared paving base beside an existing paved area.View photo ↗
Option 01

Existing prepared base

For a site where a base is already in place. Its condition, levels and drainage need assessment before it is reused.

Scope to discuss

  • Assess the existing construction
  • Agree the laying and jointing system
  • Detail borders and drainage connections
Illustration showing ground, separation fabric, aggregate and a sand layer with a compactor.View photo ↗
Option 02

Aggregate sub-base

A look at a flexible construction with compacted aggregate below the laying course. The build-up is selected for the site and intended use.

Scope to discuss

  • Excavation and ground preparation
  • Separation layer where specified
  • Compacted sub-base and laying course
Photograph of a worker levelling a sand layer within paving kerbs.View photo ↗
Option 03

Sand-based installation

A sand-based installation option. Ground support and loading must be assessed; sand alone is not a universal driveway foundation.

Scope to discuss

  • Check ground conditions and loading
  • Specify support, edges and bedding
  • Lay and joint the selected paving
Photograph of paving blocks being laid above an existing construction layer.View photo ↗
Option 04

Concrete base construction

An alternative construction using a concrete base where the project design calls for it. The bedding, drainage and movement details need to suit the paving system.

Scope to discuss

  • Prepare the specified foundation
  • Concrete and reinforcement as designed
  • Compatible bedding, joints and drainage
Photograph of a parking area with a partly completed block paved surface.View photo ↗
Option 05

Driveway & parking construction

A vehicle area needs a construction designed for its traffic. A concrete base is one possible approach, rather than a requirement for every driveway.

Scope to discuss

  • Confirm vehicle use and loading
  • Specify the foundation and drainage
  • Complete edges, paving and jointing
BELOW THE SURFACE

A beautiful finish starts with what you don’t see.

The paving is one part of the construction. Support, drainage and edges need to work as a complete system.

01

Designed for its use

A garden path and a vehicle entrance place different demands on the ground beneath them.

02

A plan for rainwater

Falls, outlets and the appropriate drainage approach need to be planned before installation.

03

Edges that belong

Restraints and transitions should be detailed alongside the paving, not left as an afterthought.

04

A site-specific build-up

Ground conditions, loading and the chosen product determine the construction. There is no single layer depth for every project.

THE FINISH, LOOKED AT CLOSELY

Details worth looking for.

When comparing projects, look beyond the overall photograph. These are the details to ask about.

Explore the gallery ↗
01

Consistent lines & considered cuts

Look at the pattern, joints and how the paving meets walls, steps and borders.

02

Levels & thresholds

Ask how the new surface will relate to doors, access points and existing features.

03

Water management

Understand where surface water is intended to go, and how the proposed system handles it.

04

The final handover

Agree what completion includes, along with care advice and any written workmanship terms.

FROM IDEA TO INSTALLATION

A clear path from start to finish.

From the first conversation to the finishing details, see how a paving project comes together.

  1. 01 / THE BRIEF

    Your space & ideas

    Share photographs, location, intended use and the look you have in mind.

  2. 02 / THE SITE

    Survey & assessment

    Review access, existing surfaces, ground conditions, levels and drainage needs.

  3. 03 / THE PLAN

    Materials & scope

    Agree the surface, pattern, borders and itemised scope before work starts.

  4. 04 / THE FOUNDATION

    Preparation

    Set out the area and carry out the groundwork required by the agreed design.

  5. 05 / THE SURFACE

    Laying & finishing

    Install the selected paving system, including cuts, joints and transitions.

  6. 06 / THE HANDOVER

    Review & care

    Walk through the finish and confirm when and how the new surface can be used.

UNDERSTANDING YOUR QUOTATION

A price with the full picture.

The area matters. So do the existing surface, site access, groundwork, material choice and the details around the edges.

A useful quotation makes the scope clear, rather than giving you a square-metre figure without context.

Discuss your paving project ↗

What to include in the discussion

01

Survey, measurements & layout

02

Removal of existing surfaces & waste

03

Groundwork & sub-base preparation

04

Paving supply, laying & jointing

05

Drainage, borders, steps & access covers

06

Completion, care advice & written terms

Confirm inclusions, exclusions, VAT, payment stages and any workmanship cover in the actual quotation.
Plan your project

Paving cost calculator

Choose your quantities with the + and − buttons. Measurements increase in steps of 5.

Type of workScopeUnitQuantityRateAmount
Paving installation
Standard block pavingLaying and jointing on a prepared base.m²
0
€30.00 / m²€0.00
Patterned block pavingPaving laid in the selected pattern.m²
0
€30.00 / m²€0.00
Groundwork
Base preparationExcavation and sub-base preparation.m²
0
€30.00 / m²€0.00
Edges & drainage
Paving edgingEdge restraint along the perimeter.m
0
€30.00 / m€0.00
Drainage channelsChannels and agreed drainage connections.m
0
€30.00 / m€0.00
Additional work
Existing surface removalRemoval of the existing paved surface.m²
0
€30.00 / m²€0.00
Steps & access coversIndividual steps or access cover items.item
0
€30.00 / item€0.00

Your message includes the selected work, quantities and estimated total. Final scope and price are confirmed after a site assessment.

BEFORE YOU BEGIN

A few good questions.

The practical details, before the first paving block is laid.

What should I send when making an enquiry?

Your location or Eircode, a few clear photographs, approximate dimensions and whether the space is for parking, walking or outdoor living. Include inspiration images if you have them.

Can you provide a price from photographs?

Photographs can help explain a project, but they do not show every ground condition or level. Any initial indication should be distinguished from a quotation based on an agreed scope and site assessment.

Which paving material should I choose?

Start with intended use, appearance and maintenance preferences. The product’s suitability, installation requirements and samples should be reviewed before a final choice.

Does paving let rainwater soak through?

Not all paving is permeable. Conventional paving needs a planned approach to surface water. A permeable system uses compatible paving, joints and underlying layers designed to manage water together.

Can new paving go over the existing base?

The existing construction needs assessment first. Its condition, support, levels and drainage determine whether it can be retained or needs replacement.

How long will the work take?

Timing depends on area, access, preparation, the chosen installation system and weather. Agree an expected programme and any curing or settling requirements for your particular project.

What guarantee or workmanship cover is included?

Ask for written workmanship terms, including the cover, exclusions and claim process, before agreeing to a project.

Can I print project photographs?

Open a photograph in the portfolio and choose “Print image”. For best results, choose a print size suitable for the photograph’s resolution.

LET’S TALK ABOUT YOUR SPACE

Something better starts here.

Your location. A few photographs. An idea of the space.
A useful starting point for your paving project.

Discuss your project ↗Chat on WhatsApp ↗
PAVING GALLERY